CoreInfra insists that commissioning be engaged early, from the planning and design stage. Following an internationally authoritative Commissioning framework, our rigorous five-level verification ensures the data center reaches the highest availability and stability before going live.
L1–L5 Framework
From factory testing to full heat-load operation, five levels of verification prove every system before it carries live workloads.
Factory Witness Test (FAT) — planning and testing of critical equipment at the factory.
Site Acceptance Inspection — equipment delivery handover and static installation checks.
Pre-functional Testing — single-equipment energization and basic functional run tests.
Functional Performance Testing — cross-system interaction and interlock-protection logic verification.
Integrated System Testing — simulated full-load operation and failover drills.
Verification Technology
Using infrared thermal imaging and heat-load simulation equipment to measure and analyze airflow organization and cooling efficiency in the hall.
Full-load blackout simulations for UPS, generators, and transfer switches (ATS/STS), ensuring seamless switchover under extreme conditions.
Ensuring as-built drawings, test reports, and operating manuals are fully archived, and helping the O&M team complete site orientation.